Design and Supervision of the construction of the eastern and western entrance and surface parking of capacity 900 cars in Birzeit for Birzeit University Project

Engineers: Turning ideas into reality

A total of 32,400 m2 for parking & 3 km of connecting roads and the works involved Retaining Walls, 300 kwp solar energy systems the system consist of suitable solar panel, inverter, cables, on grid system. The design simulated by PV-SYST Programme. Moreover, the design is recording to JDECO rules and regulations also design sewerage system, water, electricity, street lighting, telecommunication system, as well as landscaping, signing, and road marking.

  • Project Name: Design and Supervision of the construction of the eastern and western entrance and surface parking of capacity 900 cars in Birzeit for Birzeit University
  • Location: Birzeit, Palestine
  • Area in m2: 32,400 sq.m.
  • Piriod: Design 2/2019-4/2019 Supervision 5/2021-to date
  • SPECIFIC SERVICES PROVIDED: Supervision and Construction Management
  • Client: Birzeit University

إجمالي مساحة 32400 متر مربع لمواقف السيارات و3 كم من الطرق المتصلة والأعمال المتضمنة جدران احتجاز وأنظمة طاقة شمسية بقدرة 300 كيلو وات يتكون النظام من لوحة شمسية مناسبة وعاكس وكابلات ونظام متصل بالشبكة. تم محاكاة التصميم بواسطة برنامج PV-SYST. علاوة على ذلك، يتم تسجيل التصميم وفقًا لقواعد ولوائح JDECO أيضًا تصميم نظام الصرف الصحي والمياه والكهرباء وإضاءة الشوارع ونظام الاتصالات بالإضافة إلى المناظر الطبيعية واللافتات وعلامات الطرق

  • اسم المشروع: تصميم وإشراف على إنشاء المدخل الشرقي والغربي ومواقف السيارات السطحية بسعة 900 سيارة في بيرزيت لجامعة بيرزيت
  • الموقع: بيرزيت، فلسطين
  • مساحة المشروع بالمتر تربيع: 32,400 متر مربع
  • الفترة: التصميم 2/2019-4/2019 الإشراف 5/2021 حتى الآن
  • الخدمات المحددة المقدمة: الإشراف وإدارة البناء
  • العميل: جامعة بيرزيت